Frederick Haynes Newell - Reclamation Service

Reclamation Service

During the next few years the organization of the Reclamation Service was completed and plans outlined for extensive work in each of the western states, work being initiated in most of these. In 1907, when Mr. Walcott left the Geological Survey to become Secretary of the Smithsonian Institution, the Reclamation Service was organized as a separate bureau of the Department of the Interior with Mr. Newell as Director and Arthur P. Davis as Chief Engineer. Construction was rapidly pushed until twenty-six projects, including reservoirs, canals and related works were completed in whole or part, notably the Roosevelt, Shoshone, Arrowrock, Gunnison Tunnels and others, involving the investment of over $100,000,000, in 100 dams, of which ten form reservoirs of national importance also 25 miles (40 km) of tunnels, 13,000 miles (21,000 km) of irrigating canals and ditches with regulating works, bridges, steam and hydro-electric generators, transmission lines, pumps and devices connected with supplying water to 20,000 farms. Special efforts were made to attain the highest practicable economy and efficiency in the execution of the work and to meet the need and desires of the settlers under them.

Read more about this topic:  Frederick Haynes Newell

Famous quotes containing the word service:

    The summer soldier and the sunshine patriot will, in this crisis, shrink from the service of his country; but he that stands it NOW deserves the love and thanks of man and woman.
    Thomas Paine (1737–1809)