Phase 2
Construction on Phase 2 began with earth movement during June 2010 at the current western terminus. Once completed, the Phase 2 section will be concurrently signed as both SR 414 and SR 429 and will continue west and then north to a SPUI interchange a quarter mile north of Plymouth-Sorrento Road at U.S. Route 441. A surface road will be built at that location to connect between US 441 and Plymouth-Sorrento Road. This new road will pass over the right-of-way of SR 414/429, which will be further extended to the north in the future. What was SR 429 north of the current SR 414 junction will be resigned as State Road 451.
Plans for further extension, eventually to meet Interstate 4 in Sanford, are part of a corridor known as the Wekiva Parkway.
Read more about this topic: Florida State Road 414
Famous quotes containing the word phase:
“The problem of the twentieth century is the problem of the color-linethe relation of the darker to the lighter races of men in Asia and Africa, in America and the islands of the sea. It was a phase of this problem that caused the Civil War.”
—W.E.B. (William Edward Burghardt)