First Capital Connect - Performance

Performance

Performance figures for FCC covering the four week period from 17 August to 13 September 2008 were the best performance figures in the franchise history. Public Performance Measurement (PPM) reached 93.94% which is the highest level achieved in the two-and-a-half years of the First Capital Connect franchise and for the previous eight years of operating. During this period, 1.39% of services were cancelled, beating the previous low of 1.72% obtained in March 2008.

Official figures released by the ORR (Office for Rail Regulation) for the fourth quarter of the financial year 2011-12 were 88.8% PPM, 0.9% down on the previous year whilst the MAA was 90.0% up to 31 March 2012.

Read more about this topic:  First Capital Connect

Famous quotes containing the word performance:

    The honor my country shall never be stained by an apology from me for the statement of truth and the performance of duty; nor can I give any explanation of my official acts except such as is due to integrity and justice and consistent with the principles on which our institutions have been framed.
    Andrew Jackson (1767–1845)

    They say all lovers swear more performance than they are able, and yet reserve an ability that they never perform; vowing more than the perfection of ten, and discharging less than the tenth part of one.
    William Shakespeare (1564–1616)

    Kind are her answers,
    But her performance keeps no day;
    Breaks time, as dancers,
    From their own music when they stray.
    Thomas Campion (1567–1620)