Evergreen Line (Trans Link) - Design

Design

The May 2009 Project Description Report and September 2009 Project Update provided previously unconfirmed details about the Evergreen Line, including the following:

  • Travel time from Coquitlam City Centre to Lougheed Town Centre will be 15 minutes;
  • Service will be every 3 minutes during peak hours;
  • Operating hours will be approximately 20 hours/day on weekdays, less on weekends
  • The line will provide direct connections, without transfers, to what is currently the Millennium Line;
  • Projected ridership is 70,000 per day in 2021;
  • Peak hour system capacity will be 10,400 passengers in 2021;
  • Operations will be integrated with the existing SkyTrain facility near Edmonds Station on the Expo Line.

Read more about this topic:  Evergreen Line (Trans Link)

Famous quotes containing the word design:

    Westerners inherit
    A design for living
    Deeper into matter—
    Not without due patter
    Of a great misgiving.
    Robert Frost (1874–1963)