New School Construction
The students of Eastern Guilford were attending classes at a "pod village". Construction of the new Eastern Guilford High School building is complete. The school is of the same architectural design as the recently constructed Northern Guilford High School, and has a capacity of 1,600 students. The original estimated date of completion was January 2009, but construction was not completed until April 2009. Students began attending classes in the new building when they returned from spring break.
Coordinates: 36°05′36″N 79°36′56″W / 36.0934°N 79.6155°W / 36.0934; -79.6155
| This North Carolina school-related article is a stub. You can help Wikipedia by expanding it. |
Read more about this topic: Eastern Guilford High School
Famous quotes containing the words school and/or construction:
“Im tired of playing worn-out depressing ladies in frayed bathrobes. Im going to get a new hairdo and look terrific and go back to school and even if nobody notices, Im going to be the most self-fulfilled lady on the block.”
—Joanne Woodward (b. 1930)
“Theres no art
To find the minds construction in the face.”
—William Shakespeare (15641616)