East Link

East Link is a planned eastern extension of the Sound Transit Link Light Rail system, spanning about 22 miles from Downtown Seattle to the city of Redmond. Funding for construction of the portion of East Link between Downtown Seattle and Overlake Transit Center was approved by voters in November 2008, while the final segment between Overlake Transit Center and Downtown Redmond was identified as a priority extension in a future expansion measure. As of early 2012, construction of East Link was projected to begin in 2015, with the line opening for service as far as Overlake in 2023.

Read more about East Link:  Routing, Technical Challenges, Stations

Famous quotes containing the words east and/or link:

    Senta: These boats, sir, what are they for?
    Hamar: They are solar boats for Pharaoh to use after his death. They’re the means by which Pharaoh will journey across the skies with the sun, with the god Horus. Each day they will sail from east to west, and each night Pharaoh will return to the east by the river which runs underneath the earth.
    William Faulkner (1897–1962)

    Before I had my first child, I never really looked forward in anticipation to the future. As I watched my son grow and learn, I began to imagine the world this generation of children would live in. I thought of the children they would have, and of their children. I felt connected to life both before my time and beyond it. Children are our link to future generations that we will never see.
    Louise Hart (20th century)