Earlswood (Surrey) Railway Station - Future Developments

Future Developments

The Thameslink Programme (formerly Thameslink 2000) project proposes to turn some of the Southern services over to the expanded Thameslink network under First Capital Connect. This will see services that currently terminate at London Bridge continuing through Central London and north wards via the Midland Main Line or East Coast Main Line to destinations such as Luton or Cambridge. This however is not imminent, a Department for Transport whitepaper states only that "the Thameslink Programme will be completed by the end of 2015" and that "interim outputs will be delivered by the end of 2011", leaving Southern as the main operator for several more years to come. The Thameslink Programme is centred around 12 car long trains, thus Earlswood station could potentially have its platforms lengthened as they can only currently accommodate 10 car long trains.

Read more about this topic:  Earlswood (Surrey) Railway Station

Famous quotes containing the words future and/or developments:

    “[M]y conception of liberty does not permit an individual citizen or a group of citizens to commit acts of depredation against nature in such a way as to harm their neighbors and especially to harm the future generations of Americans. If many years ago we had had the necessary knowledge, and especially the necessary willingness on the part of the Federal Government, we would have saved a sum, a sum of money which has cost the taxpayers of America two billion dollars.”
    —Franklin D. Roosevelt (1882–1945)

    “The developments in the North were those loosely embraced in the term modernization and included urbanization, industrialization, and mechanization. While those changes went forward apace, the antebellum South changed comparatively little, clinging to its rural, agricultural, labor-intensive economy and its traditional folk culture.”
    —C. Vann Woodward (b. 1908)