Dubai Metro - Signaling

Signaling

To permit fully automated operation, Thales Rail Signalling Solutions is supplying its SelTrac IS communications-based train control and NetTrac central control technology. This is configured for a minimum headway of 90 sec. Maximum speed of the trains will be 90 km/h, giving a round-trip time of 2 h 23 min for the Red Line and 1 h 23 min for the Green Line.

Red Line trains will initially run every 7 minutes off-peak, with a minimum headway of 3 min 45 sec provided during the peaks, when 44 trainsets will be in service. From 2010, when 51 trains will be in service, the line will have a peak-hour capacity of 11,675 passengers per hour in each direction. The theoretical maximum design capacity is 25,720 passengers per hour, which would require 106 trains.

The Green Line will have an initial capacity of 6,395 passengers per hour per direction, with 16 trains in service. The design capacity of this route is put at 13,380 passengers per hour, with 60 trains in service.

Over 280,000 passengers used the Dubai Metro during the first week of its operation.

Read more about this topic:  Dubai Metro