| Unit 1 | Unit 2 | |
|---|---|---|
| Reactor Type | Pressurized Water | Pressurized Water |
| Reactor Manufacturer | Westinghouse | Westinghouse |
| Turbine Manufacturer | General Electric | Brown Boveri |
| Generation Capacity | 1,020 megawatts | 1,090 megawatts |
| Transmission System Connection | 345,000 volts | 765,000 volts |
| Construction Began | March 1, 1969 | March 1, 1969 |
| Grid connection | February 10, 1975 | March 22, 1978 |
| Operational Date | August 27, 1975 | July 1, 1978 |
| Expiration of Original License | October 25, 2014 | December 23, 2017 |
| Expiration of Renewed License | 2034 | 2037 |
Read more about this topic: Donald C. Cook Nuclear Generating Station
Famous quotes containing the words additional and/or information:
“The world will never be long without some good reason to hate the unhappy; their real faults are immediately detected, and if those are not sufficient to sink them into infamy, an additional weight of calumny will be superadded.”
—Samuel Johnson (17091784)
“Computers are good at swift, accurate computation and at storing great masses of information. The brain, on the other hand, is not as efficient a number cruncher and its memory is often highly fallible; a basic inexactness is built into its design. The brains strong point is its flexibility. It is unsurpassed at making shrewd guesses and at grasping the total meaning of information presented to it.”
—Jeremy Campbell (b. 1931)