Design Quality Indicator - Methodology

Methodology

DQI is completed by a range of stakeholders in the briefing and design stages of a building project, or on a completed building. Stakeholders who participate include:

  • Building users (or potential users)
  • Building clients
  • Facilities managers (or future facilities managers)
  • Architects
  • Structural and building services engineers
  • Quantity surveyors (Cost engineer)
  • Project managers

DQI is applied in a facilitated workshop that is led by a certified DQI facilitator.

Read more about this topic:  Design Quality Indicator

Famous quotes containing the word methodology:

    One might get the impression that I recommend a new methodology which replaces induction by counterinduction and uses a multiplicity of theories, metaphysical views, fairy tales, instead of the customary pair theory/observation. This impression would certainly be mistaken. My intention is not to replace one set of general rules by another such set: my intention is rather to convince the reader that all methodologies, even the most obvious ones, have their limits.
    Paul Feyerabend (1924–1994)