Derwent Valley Light Railway - Final Years

Final Years

In 1976, the owners of the railway decided to operate steam trains between Layerthorpe and Dunnington, which was the entire length of the line at that time. A regular summer service started in 1977, with J72 0-6-0T locomotive number 69023 Joem (now preserved at the North Yorkshire Moors Railway) operating the services. By 1979, there were not enough passengers to justify continuing and the service ceased. The railway continued to carry occasional freight trains to Dunnington until 1981 when the grain driers at Dunnington closed and the last major source of freight for the line was gone. On top of that the railway was in desperate need a major overhaul with the majority of the rails and buildings still being the 1913 originals. However, the owners decided that the lack of demand for freight failed to justify any plan of action other than to close the line down. The last train ran on 27 September 1981.

Read more about this topic:  Derwent Valley Light Railway

Famous quotes containing the words final and/or years:

    “The final flat of the hoe’s approval stamp
    Is reserved for the bed of a few selected seed.”
    —Robert Frost (1874–1963)

    “When white men were willing to put their own offspring in the kitchen and corn field and allowed them to be sold into bondage as slaves and degraded them as another man’s slave, the retribution of wrath was hanging over this country and the South paid penance in four years of bloody war.”
    —Rebecca Latimer Felton (1835–1930)