Operation
Dargaville Branch operations have never been spectacular. From its opening until March 1967, mixed trains carrying both passengers and freight ran to connect with passenger services on the North Auckland Line - the Northland Express (Auckland-Opua and return) until November 1956, and then the 88 seater railcars (Auckland-Okaihau and return). After March 1967, the line carried freight only, and in recent years, its future has been under question. At one point in the first half of the 2000s, it was closed for six months, but traffic has now returned and the line is operated from Whangarei. A daily return train is scheduled from Monday to Friday but it only runs when required. It takes roughly three hours both ways; the service to Dargaville arrives in the mid-morning and departs before lunch, arriving in Whangarei in the mid-afternoon.
Read more about this topic: Dargaville Branch
Famous quotes containing the word operation:
“An absolute can only be given in an intuition, while all the rest has to do with analysis. We call intuition here the sympathy by which one is transported into the interior of an object in order to coincide with what there is unique and consequently inexpressible in it. Analysis, on the contrary, is the operation which reduces the object to elements already known.”
—Henri Bergson (18591941)
“It is critical vision alone which can mitigate the unimpeded operation of the automatic.”
—Marshall McLuhan (19111980)
“You may read any quantity of books, and you may almost as ignorant as you were at starting, if you dont have, at the back of your minds, the change for words in definite images which can only be acquired through the operation of your observing faculties on the phenomena of nature.”
—Thomas Henry Huxley (182595)