Critical Path Method
The critical path method (CPM) is an algorithm for scheduling a set of project activities. It is an important tool for effective project management.
Read more about Critical Path Method: History, Basic Technique
Famous quotes containing the words critical, path and/or method:
“A third variety of drama ... begins as tragedy with scraps of fun in it ... and ends in comedy without mirth in it, the place of mirth being taken by a more or less bitter and critical irony.”
—George Bernard Shaw (18561950)
“Often on bare rocky carries the trail was so indistinct that I repeatedly lost it, but when I walked behind him I observed that he could keep it almost like a hound, and rarely hesitated, or, if he paused a moment on a bare rock, his eye immediately detected some sign which would have escaped me. Frequently we found no path at all at these places, and were to him unaccountably delayed. He would only say it was ver strange.”
—Henry David Thoreau (18171862)
“... the one lesson in the ultimate triumph of any great actress has been to enforce the fact that a method all technique or a method all throes, is either one or the other inadequate, and often likely to work out in close proximity to the ludicrous.”
—Mrs. Leslie Carter (18621937)