Cordwood - Process

Process

In certain jurisdictions construction plans are subject to the building inspector's approval. Before building, soil conditions on the site must be verified to support heavy cordwood masonry walls.

With felled timber, bark should be removed in the spring with a shovel, chisel, or bark spud. The sap is still running in spring time and provides a lubricating layer of cambium between the bark and wood, making separation an easier task than if left until the fall when the two layers are well-bonded together. Once debarked, the logs should sit to dry for at least three summers to limit splitting and checking. It is important to cut the logs, once debarked to the chosen building length. Richard Flatau, Cordwood Construction: Best Practices (2012) suggest splitting 70% of the wood for better drying and seasoning.

After drying, the logs must be sawed to the desired length (usually 16, 18, or 24 in.). In this case a metal handsaw is preferable to a chainsaw because its finer cut helps to ward moisture and pest penetration. Actually a "cut off " saw or "buzz saw" will make quick work of cutting cordwood into chosen lengths. For especially furry ends like on cedar, rasps can be used for smoothing.

The wood then needs to be transported to the building site. It is convenient to have the source of cordwood and construction site nearby. Once a proper foundation has been poured which rises 12-24 inches above ground level with a splash guard, construction of the walls can begin. Temporary shelters can be used to cover the worksite and cordwood from rain. A post and beam frame supplies this shelter for subsequent cordwood mortaring.

Inexperienced homebuilders should experiment with a number of practice walls. This will ultimately expedite the building process and provide more satisfying results. When experimenting with M-I-M, (the more common form), two parallel 3 to 4 inch beads of mortar are laid down along the foundation, followed by a middle filling of insulation material. Then logs are laid on top with consistent mortar gaps, protruding no more than 1 inch on the inside and outside of the wall. Actual placement will depend on the size and shapes of the logs. Another layer of mortar is spread, then insulation poured in between, more logs follow and so on. When experimenting with Throughwall, a thin, even layer of insulative mortar is laid along the foundation, then the logs are seated firmly in the mortar bed, in an even fashion, leaving only enough space between them to "point" the mortar. The mortar gaps are filled to make a relatively flat top surface, then another thin layer of mortar is added and the process repeats. The shape and exterior orientation of logs is important only for appearance. Pre-split “firewood style” logs check less when in the wall and are easier to point or smooth and press evenly around than round pieces because the mortar gaps are generally smaller.

If constructing a house with corners, each course of cordwood should be cross hatched for strength. Near the end, small filler slats of wood may be required to finish the joining or tops of walls. Windows and doors are framed with standard window boxes and wooden lintels. Glass bottles can be inserted for a creative stained glass effect. (Plumbing and electrical wiring are issues to consider but will not be elaborated on in this article).

A cordwood house should have deep overhanging eaves of at least 12- 16 inches to keep the log ends dry and prevent fungal growth. If the ends are maintained to be dry and well aerated, they will age without problem. Some owners have coated their ends with linseed oil, or set the outside log ends flush with the mortar for further weatherproofing. Over time, some checking is normal, and can be remedied with periodic mortar or caulking maintenance.

Read more about this topic:  Cordwood

Famous quotes containing the word process:

    My advice to people today is as follows: If you take the game of life seriously, if you take your nervous system seriously, if you take your sense organs seriously, if you take the energy process seriously, you must turn on, tune in, and drop out.
    Timothy Leary (b. 1920)

    Any balance we achieve between adult and parental identities, between children’s and our own needs, works only for a time—because, as one father says, “It’s a new ball game just about every week.” So we are always in the process of learning to be parents.
    Joan Sheingold Ditzion, Dennie, and Palmer Wolf. Ourselves and Our Children, by Boston Women’s Health Book Collective, ch. 2 (1978)

    In contrast to revenge, which is the natural, automatic reaction to transgression and which, because of the irreversibility of the action process can be expected and even calculated, the act of forgiving can never be predicted; it is the only reaction that acts in an unexpected way and thus retains, though being a reaction, something of the original character of action.
    Hannah Arendt (1906–1975)