Launch, Berthing and Outfitting
In November 2007, Columbus was moved out of the KSC Space Station Processing Facility, and installed into the payload bay of the Atlantis orbiter for launch on ISS assembly flight 1E. During cryo-filling of the space shuttle External Tank (ET) with liquid hydrogen and liquid oxygen prior to the first launch attempt on December 6, 2007, two of four LH2 ECO sensors failed a test. Mission rules called for at least three of the four sensors to be in working order for a launch attempt to proceed. As a result of the failure, the Launch Director Doug Lyons postponed the launch, initially for 24 hours. This was later revised into a 72 hour delay, resulting in a next launch attempt set for Sunday December 9, 2007. This launch attempt was scrubbed when one of the ECO sensors again failed during fuelling.
The ECO sensors external connector was changed on the space shuttle external tank, causing a two month delay in the launch. Columbus was finally launched successfully on the third attempt at 2:45pm EST, February 7, 2008. Once at the station, Canadarm2 removed Columbus from the docked shuttle's cargo bay and attached it to the starboard hatch of Harmony (also known as Node 2), with the cylinder pointing outwards on February 11, 2008.
Read more about this topic: Columbus (ISS Module)