Columbia Grammar & Preparatory School - Campus

Campus

Columbia Grammar & Prep greatly expanded its physical plant after 1985. Three entirely new buildings and a fully renovated brownstone have, together with the existing buildings, added academic facilities as well as two new theaters, several computer labs, a variety of art studios and space for a growing music program. The Grammar School is located in a series of five interconnecting brownstones on the tree-shaded 94th Street, just off Central Park, and the original Columbia Grammar School building (1905) at 5 West 93rd Street. In addition to classrooms, these house two libraries, two art studios, a gymnasium, swimming pool, two music studios, a science lab, a computer lab, and the Grammar School cafeteria.

The school began its expansion in 1984 with the construction of a new preparatory school at 4 West 93rd, containing a full-sized gymnasium, three science labs, state-of-the art computer lab, library, three music studios and nine classrooms.

In 1996, 36 West 93rd Street was completed, adding 42,500 square feet (3,950 m2) of space to the physical plant. This building, which goes through from 93rd to 92nd Street, has two computer labs, five art studios, library, science labs and classrooms for grades 5 and 6, a fully equipped theater, and a large cafeteria. However, due to the schools increasing size, the cafeteria has been unable to seat all the students and staff. This problem has led to a substantial increase in the number of students who choose to have lunch outside of school.

In September 2001 a major addition was added onto the high school containing yet another full-sized gym, a state-of-the-art theater, and three floors of classrooms and science labs. Five new classrooms were also added.

Since then, many brownstones have been added, one entirely for offices, and a building dedicated to the arts. A walkway is to be built behind the multiple brownstones to make them easier to navigate. In 2009, Columbia purchased several new brownstones, one entirely for the kindergarten, another for a science building, and one for administrative offices. Two new levels are being constructed in the 5th and 6th grade building. The prep school also added a new level to its library.