Design and Development
The project was launched in 2002, at a cost of NT$700 million (US$21.9 million).
Mass production started in 2007, with an initial order for 600 units. It is estimated that up to 1,400 CM-32s may end up being in operational service. The Armor of the CM-32 provides protection of 7.62mm AP rounds, while the frontal arc withstands 12.7mm AP rounds. NBC protection and fire suppression systems are also standard. The V-shaped hull provides protection from landmines and can withstand 12kg of TNT under any wheel. The CM-32 is armed with a 12.7mm machine gun in it's basic APC form. It can also house a 20mm chaingun or a 120mm mortar or a 105mm cannon.
Read more about this topic: CM-32 Armoured Vehicle
Famous quotes containing the words design and/or development:
“Joe ... you remember I said you wouldnt be cheated?... Nobody is really. Eventually all things work out. Theres a design in everything.”
—Sidney Buchman (19021975)
“Men are only as good as their technical development allows them to be.”
—George Orwell (19031950)