Planned Replacement Bridge
The city plans to demolish the bridge, due to its deteriorated condition, and replace it with a cable-stayed bridge. The current design calls for a 150 ft (46 m) high tower, 13 ft (4 m) wide at the top, with a base of 26 ft (8 m). Vertical clearance above high water would be 12 ft. The new bridge would be located in the same footprint as the existing bridge, although it would be 17 ft (5.2 m) wider to accommodate three standard-width traffic lanes, a bicycle lane and a pedestrian walkway.
The original schedule was for the project to begin in 2007 with completion in 2010. The project is currently scheduled to start in June 2012. Due to the project postponement, during 2010 repairs were made to the existing bridge deck, piers, and west abutment.
As of 2005 the estimated cost of the project was $50 million. As of 2009 the estimate increased to $120 million due to redesigns and the addition of related projects.
Some residents oppose the design of the proposed bridge and feel that its tower would be out of character with the low-rise homes on City Island.
Read more about this topic: City Island Bridge
Famous quotes containing the words planned, replacement and/or bridge:
“Now the birth of Jesus the Messiah took place in this way. When his mother Mary had been engaged to Joseph, but before they lived together, she was found to be with child from the Holy Spirit. Her husband Joseph, being a righteous man and unwilling to expose her to public disgrace, planned to dismiss her quietly.”
—Bible: New Testament, Matthew 1:18,19.
“Not even the visionary or mystical experience ever lasts very long. It is for art to capture that experience, to offer it to, in the case of literature, its readers; to be, for a secular, materialist culture, some sort of replacement for what the love of god offers in the world of faith.”
—Salman Rushdie (b. 1947)
“What need the bridge much broader than the flood?”
—William Shakespeare (15641616)