Chula Vista High School - Construction Upgrades

Construction Upgrades

CVHS underwent a renovation to several classrooms and received a new ASB building in 2006-2007 as part of Proposition BB. And as of recently (under Proposition O) the school received a new state-of-the-art multi purpose performing arts center (now named Jack Tygett Performing Arts Center) and library. Turner Construction started work on these buildings started in the summer of 2009, and was completed and occupied by students and staff in January 2011. In addition, the schools locker rooms, weight room, and gymnasium were gutted and renovated.

Chula Vista High School was in dire need for a major upgrade for many years, and within the last decade under Propositions BB and Prop O, the school has steadily been improving. Classrooms were renovated in 2006, and construction on the new buildings on campus began in 2009. The Jack Tygett Performing Arts Center is one of the largest environmentally friendly performing arts venues in the South Bay, and is seeking LEED Platinum certification. This center seats over 700 guests, and has movable seating, enabling this venue to be used in a variety of events. 4 classrooms are also attached to the Tygett Center - Band, Orchestra/Mariachi, Dance, and Choir rooms - all sound dampened along with their own private offices for teachers, and ample storage for students. There are also dressing rooms, and 3 lobbies in the front of the building with a vast amount of glass to minimize artificial lighting and let natural light come through. A Spartan statue donated by a previous graduating class, was also relocated from another part on campus to stand in front of this new center to be more visible, and serve as a focal point in front of the building. Phase 1 also included work on renovating the school's gymnasium and locker rooms by installing new flooring, upgrading electrical and heating systems, new windows, cabinets, new movable bleachers in the gym, and a fresh coat of paint.

Turner Construction Company, one of the leading green builders in the U.S., served the General Contractor for Phase 1 from 2009-2011, and successfully completed the project with zero safety incidents. BCA Architects designed both the performing arts center, along with the new Library located by K Street. BCA utilized Eco-conscious materials in these buildings, which include low voltage lighting, low v.o.c. adhesives and finishes, energy efficient windows and conditioning systems, white rooftops, and soon to be added solar panels. The exterior landscape surrounding these buildings also has the environment in mind with pervious concrete strips to let rainfall migrate back into the ground naturally, and reduce runoff; as well as low water use plantings.

Subcontractors for this project included Structures West for concrete work; McMahon Steel; Pecoraro Painting; Brady Company for stucco, drywall, and doors; Resource Floors; New Era Tile; New Dimension Masonry; La Mesa Glass; California Comfort Systems; and Benchmark Landscape.

Construction on Phase 2 at Chula Vista High School was slated to begin sometime around 2012, although recent budget constraints among other issues have this in question.

Read more about this topic:  Chula Vista High School

Famous quotes containing the word construction:

    There is, I think, no point in the philosophy of progressive education which is sounder than its emphasis upon the importance of the participation of the learner in the formation of the purposes which direct his activities in the learning process, just as there is no defect in traditional education greater than its failure to secure the active cooperation of the pupil in construction of the purposes involved in his studying.
    John Dewey (1859–1952)