Changi Boardwalk - History

History

The Changi Boardwalk was conceptualised by the Urban Redevelopment Authority (URA) as part of the Singapore Green Plan 2012 to enhance Changi point. The first phase construction of the boardwalk, comprising the western sections of the boardwalk, started on 29 October 2001 and was completed on 15 August 2003, costing S$3.5 million. The second phase construction of the boardwalk, comprising the eastern sections, was completed in five stages from 2004 to 2006. The total cost of environmental improvement works for Changi Point – including the S$5.4 million boardwalks and S$8 million improvements to the Changi Point Ferry Terminal – was about S$16.7 million.

Read more about this topic:  Changi Boardwalk

Famous quotes containing the word history:

    Let us not underrate the value of a fact; it will one day flower in a truth. It is astonishing how few facts of importance are added in a century to the natural history of any animal. The natural history of man himself is still being gradually written.
    Henry David Thoreau (1817–1862)

    The history of mankind interests us only as it exhibits a steady gain of truth and right, in the incessant conflict which it records between the material and the moral nature.
    Ralph Waldo Emerson (1803–1882)

    It’s not the sentiments of men which make history but their actions.
    Norman Mailer (b. 1923)