Chalk River Laboratories - 2009 NRU Reactor Shutdown

2009 NRU Reactor Shutdown

In mid-May 2009 the heavy water leak at the base of the NRU reactor vessel, first detected in 2008 (see above), returned at a greater rate and prompted another temporary shutdown that lasted until August 2010. The lengthy shutdown was necessary to first completely defuel the entire reactor, then ascertain the full extent of the corrosion to the vessel, and finally to effect the repairs — all with remote and restricted access from a minimum distance of 8 metres due to the residual radioactive fields in the reactor vessel. The 2009 shutdown occurred at a time when only one of the other four worldwide regular medical isotope sourcing reactors was producing, resulting in a worldwide shortage.

Read more about this topic:  Chalk River Laboratories