Central Area Transmission System - Route

Route

The pipeline runs from CATS Riser Platform adjacent to the BG Group operated Everest gasfield in the Central North Sea, some 230 kilometres (140 mi) east of Aberdeen, to Teesside in England. The pipeline reaches the shore at Coatham Sands near Redcar where it meets a Beach Valve Station. The gas travels under the River Tees in a 5-mile (8.0 km) long pipeline to the gas terminal.

The CATS pipeline was originally conceived to carry natural gas from the Everest and Lomond fields and was built oversized to accommodate future production from fields in the surrounding area. The CATS pipeline now transports gas from other fields such as Fleming, Judy, Jade, Maria et al. through six connection points, known as 'tees' (T1 to T6), and seven CATS hubs.

Read more about this topic:  Central Area Transmission System

Famous quotes containing the word route:

    By a route obscure and lonely,
    Haunted by ill angels only,
    Where an eidolon, named Night,
    On a black throne reigns upright,
    I have reached these lands but newly
    From an ultimate dim Thule—
    From a wild weird clime that lieth, sublime,
    Out of space—out of time.
    Edgar Allan Poe (1809–1849)

    no arranged terror: no forcing of image, plan,
    or thought:
    no propaganda, no humbling of reality to precept:
    terror pervades but is not arranged, all possibilities
    of escape open: no route shut,
    Archie Randolph Ammons (b. 1926)