Cardiff Bay Barrage - Construction

Construction

Construction was undertaken by a Balfour Beatty / Costain Joint Venture. The electrical and control systems equipment was designed, installed and commissioned by Lintott Control Systems (Norwich). Construction started in 1994, following the successful passage of the Cardiff Bay Barrage Act of 1993 through the UK Parliament. The bill included provisions for compensation for any homes damaged by the barrage and a large wetland habitat for birds further east down the Bristol Channel. Features include a fish pass to allow salmon to reach breeding grounds in the River Taff and three locks for maritime traffic. Construction was completed in 1999 and shortly afterwards the barrage came into effect. The impounding of the River Taff and River Ely created a 2-square-kilometre (490-acre) freshwater lake.

Read more about this topic:  Cardiff Bay Barrage

Famous quotes containing the word construction:

    There is, I think, no point in the philosophy of progressive education which is sounder than its emphasis upon the importance of the participation of the learner in the formation of the purposes which direct his activities in the learning process, just as there is no defect in traditional education greater than its failure to secure the active cooperation of the pupil in construction of the purposes involved in his studying.
    John Dewey (1859–1952)

    Striving toward a goal puts a more pleasing construction on our advance toward death.
    Mason Cooley (b. 1927)

    The construction of life is at present in the power of facts far more than convictions.
    Walter Benjamin (1892–1940)