Caracas Metro - Future Expansions

Future Expansions

Immediate plans include the completion of the second phase of Line 3, which runs from the El Valle station to La Rinconada, the latter being opened on October 2006, and now requires the addition of the intermediate stations (Los Jardines, Coche and Mercado) which were officially opened on January 9, 2010.

The next phases of the Line 2 extension (also known as Line 5 during construction phase) will be constructed and opened by 2012. The first project a 7.5 km extension includes 6 new stations Bello Monte, Las Mercedes, Tamanaco, Chuao, Bello Campo and Parque del Este II station. A separate project to be carried out simultaneously, a further 6.7 km Line 2 extension (also known as Line 5 or Metro Guarenas-Guatire Urban Route during the construction phase) with 4 additional stations will include the following stations Montecristo, BoleĆ­ta, El Marques and terminal/transfer station La Urbina (Petare Norte).

The La Urbina station will be also be Caracas Guarenas-Guatire light rail transfer point. This 31.4 km long has already been assigned funds and is expected to be completed by 2012.

Long range plans contemplate expanding the system with two more lines: Line 5 (15 km long) to southeast Caracas, and Line 6 (17 km) that would run parallel to Line 1 to the north.

Read more about this topic:  Caracas Metro

Famous quotes containing the word future:

    He had been given to behold
    The race’s future trial place,
    A fresh start for the human race.
    Robert Frost (1874–1963)