Cape Cod Canal Railroad Bridge - Design and Construction

Design and Construction

The bridge was constructed beginning in 1933 by the Public Works Administration from a design by firms Parsons, Klapp, Brinckerhoff, and Douglas as well as Mead and White (both of New York), for the United States Army Corps of Engineers, which operates both the bridge and the canal. The bridge has a 544-foot (166 m) main span, with a 135-foot (41 m) clearance when raised, uses 1,100-short-ton (1,000 t) counterweights on each end, and opened on December 29, 1935.

At the time of its completion, it was the longest lift span in the world. It is now the second longest lift bridge in the United States, the longest being the Arthur Kill Vertical Lift Bridge between New Jersey and Staten Island, New York. The bridge replaced a 1910 bascule bridge.

Read more about this topic:  Cape Cod Canal Railroad Bridge

Famous quotes containing the words design and/or construction:

    Teaching is the perpetual end and office of all things. Teaching, instruction is the main design that shines through the sky and earth.
    Ralph Waldo Emerson (1803–1882)

    There’s no art
    To find the mind’s construction in the face:
    He was a gentleman on whom I built
    An absolute trust.
    William Shakespeare (1564–1616)