Positive Train Control
Positive train control systems can be overlaid onto cab signal systems or can replace them altogether. These include the Incremental Train Control System (ITCS) installed by GE on the Chicago-Detroit route in Michigan and the North American Joint Positive Train Control (NAJPTC) system being testing in Illinois on the Chicago-St. Louis route. The ITCS has been in revenue service since 2002 with speeds up to 90 miles per hour (140 km/h). Other systems include Alaska Railroad's CAS, CSX's CBTM, and BNSF's ETMS and V-ETMS manufactured and installed by Wabtec.
Read more about this topic: Cab Signalling
Famous quotes containing the words positive, train and/or control:
“If all political power be derived only from Adam, and be to descend only to his successive heirs, by the ordinance of God and divine institution, this is a right antecedent and paramount to all government; and therefore the positive laws of men cannot determine that, which is itself the foundation of all law and government, and is to receive its rule only from the law of God and nature.”
—John Locke (16321704)
“Put me on a moving train if Im sick, and Ill get well. Its good for mind and body to get out and see the world.”
—Maria D. Brown (18271927)
“To try to control a nine-month-olds clinginess by forcing him away is a mistake, because it counteracts a normal part of the childs development. To think that the child is clinging to you because he is spoiled is nonsense. Clinginess is not a discipline issue, at least not in the sense of correcting a wrongdoing.”
—Lawrence Balter (20th century)