The tunnel was constructed between 1996 and 2000 by Transfield–Obayashi Corporation Joint Venture. Prior to its opening to traffic, the tunnel was opened to the public to walk through from Southbank to Burnley, on 16 December 2000.
The tunnel was opened to traffic on 22 December 2000. In February 2001 it was found that a wall panel was cracked with 5 litres of water a second entering the tunnel. The cause was later found to be floor sections lifting from water pressure, and modifications to correct this being approved in November 2001. Also in 2001 Transfield Obayashi Joint Venture agreed to pay Transurban $157 million in damages in an out-of-court settlement over late completion of the tunnel.
Transurban launched further legal action against the Transfield Obayashi Joint Venture in 2007, after radar tests indicated the tunnel walls were thinner than that specified in the contract, possibly resulting in the tunnel not lasting for the proposed 100-year design life. Further tunnel leaks were also discovered in 2007, but were unrelated to the tunnel fire.
Read more about this topic: Burnley Tunnel
Famous quotes containing the word history:
“To history therefore I must refer for answer, in which it would be an unhappy passage indeed, which should shew by what fatal indulgence of subordinate views and passions, a contest for an atom had defeated well founded prospects of giving liberty to half the globe.”
—Thomas Jefferson (17431826)
“Three million of such stones would be needed before the work was done. Three million stones of an average weight of 5,000 pounds, every stone cut precisely to fit into its destined place in the great pyramid. From the quarries they pulled the stones across the desert to the banks of the Nile. Never in the history of the world had so great a task been performed. Their faith gave them strength, and their joy gave them song.”
—William Faulkner (18971962)
“The history of the Victorian Age will never be written: we know too much about it.”
—Lytton Strachey (18801932)