Bulk Tank - Operating Costs

Operating Costs

Substantial reductions in running costs can be made when an ice builder is used in conjunction with off-peak electricity. Pre-cooling milk using a plate or a tube cooler supplied with mains or well water can also reduce costs and add to the cooling capacity of the tank.

Bulk tank condenser units, which are not an integral part of the tank, should be fitted in an adjacent, suitable and well ventilated place.

If at all possible, condenser units should not be fitted on a wall facing the sun. They should be installed in a way which allows them to draw in and discharge adequate quantities of air for efficient operation.

Bulk tank should be easily accessible by large bulk collection tankers and positioned so that the tanker approaches can be kept clean and free from cow traffic at all times.

Although tanks have been calibrated when first installed, bulk tank miscalibration is not uncommon and in some cases it can result in significant loss of income. Milk tanks calibrated on the low side, can cheat raw milk producers by up to 22 litres on each shipment. It is therefore advisable to re-calibrate a bulk tank.

Read more about this topic:  Bulk Tank

Famous quotes containing the words operating and/or costs:

    I love meetings with suits. I live for meetings with suits. I love them because I know they had a really boring week and I walk in there with my orange velvet leggings and drop popcorn in my cleavage and then fish it out and eat it. I like that. I know I’m entertaining them and I know that they know. Obviously, the best meetings are with suits that are intelligent, because then things are operating on a whole other level.
    Madonna [Madonna Louise Ciccione] (b. 1959)

    It costs more to maintain ten vices than one virtue.
    —H.L. (Henry Lewis)