British United Shoe Machinery - BUSM Factory Site

BUSM Factory Site

In 2007 a planning application was made for 1210 houses on the former site by Trafalgar Global Ltd. The construction of new homes commenced in 2010 with the first residential occupiers of site moving in in 2011. The first phase of the development was completed in 2011 by Westleigh Developments Ltd. The second phase of the housing development is now underway.

Read more about this topic:  British United Shoe Machinery

Famous quotes containing the words factory and/or site:

    The factory was very fine;
    He wished it all the modern speed.
    Yet, after all, ‘twas not divine,
    That is to say, ‘twas not a church.
    Robert Frost (1874–1963)

    It is not menstrual blood per se which disturbs the imagination—unstanchable as that red flood may be—but rather the albumen in the blood, the uterine shreds, placental jellyfish of the female sea. This is the chthonian matrix from which we rose. We have an evolutionary revulsion from slime, our site of biologic origins. Every month, it is woman’s fate to face the abyss of time and being, the abyss which is herself.
    Camille Paglia (b. 1947)