British United Shoe Machinery - BUSM Factory Site

BUSM Factory Site

In 2007 a planning application was made for 1210 houses on the former site by Trafalgar Global Ltd. The construction of new homes commenced in 2010 with the first residential occupiers of site moving in in 2011. The first phase of the development was completed in 2011 by Westleigh Developments Ltd. The second phase of the housing development is now underway.

Read more about this topic:  British United Shoe Machinery

Famous quotes containing the words factory and/or site:

    Baltimore lay very near the immense protein factory of Chesapeake Bay, and out of the bay it ate divinely. I well recall the time when prime hard crabs of the channel species, blue in color, at least eight inches in length along the shell, and with snow-white meat almost as firm as soap, were hawked in Hollins Street of Summer mornings at ten cents a dozen.
    —H.L. (Henry Lewis)

    The present hour is always wealthiest when it is poorer than the future ones, as that is the pleasantest site which affords the pleasantest prospects.
    Henry David Thoreau (1817–1862)