British Rail Class 404 - Phase 2 Units

Phase 2 Units

The SR then electrified the line from Three Bridges to Portsmouth via Horsham and the coastal route from West Worthing to Havant, with services over this route commencing in July 1938. For services from London Victoria to Portsmouth over these lines, another 26 4-COR units (numbered 3130–3155) were built, together with 13 4-BUF units (4-car Buffet units, numbered 3073–3085).

These new units followed the same design as the Phase 1 stock, except that the restaurant and kitchen facilities of the 4-RES units were replaced by the simpler provision of a buffet. All of these units were built by the SR at its Eastleigh works.

Read more about this topic:  British Rail Class 404

Famous quotes containing the words phase and/or units:

    I had let preadolescence creep up on me without paying much attention—and I seriously underestimated this insidious phase of child development. You hear about it, but you’re not a true believer until it jumps out at you in the shape of your own, until recently quite companionable child.
    Susan Ferraro (20th century)

    Even in harmonious families there is this double life: the group life, which is the one we can observe in our neighbour’s household, and, underneath, another—secret and passionate and intense—which is the real life that stamps the faces and gives character to the voices of our friends. Always in his mind each member of these social units is escaping, running away, trying to break the net which circumstances and his own affections have woven about him.
    Willa Cather (1873–1947)