Important Dates
- 1994 – September, EPA/DEQ issue Record of Decision (ROD) for Butte Mine Flooding Operable Unit.
- 1996 – April, Montana Resources (MR) and ARCO divert Horseshoe Bend (HSB) drainage water away from Berkeley Pit to slow filling rate, per ROD.
- 2000 – July, MR suspends mining operations due to high energy costs; HSB water allowed to flow back into pit, increasing pit filling rate.
- 2002 – March, USEPA and Montana Department of Environmental Quality (MDEQ) enter into a Consent Decree with BP/ARCO and the Montana Resources Group (known as the Settling Defendants) for settlement of past and future costs for this site.
- 2002 – Fall, USEPA and MDEQ issue order for Settling Defendants to begin design of water treatment plant for HSB water. Settling Defendants issue contract and begin construction of treatment plant.
- 2003 – November, MR resumes mining operations.
- 2003 – November 17, HSB water treatment plant comes on line slowing pit filling rate.
Read more about this topic: Berkeley Pit
Famous quotes containing the words important and/or dates:
“Why doesnt the United States take over the monarchy and unite with England? England does have important assets. Naturally the longer you wait, the more they will dwindle. At least you could use it for a summer resort instead of Maine.”
—W.H. (Wystan Hugh)
“I never heard of an old man forgetting where he had buried his money! Old people remember what interests them: the dates fixed for their lawsuits, and the names of their debtors and creditors.”
—Marcus Tullius Cicero (10643 B.C.)
Related Phrases
Related Words