The Shannon Scheme
In 1925 the works commenced after the passing of the Shannon Electricity Act, 1925 and by 1927 the project was at an advanced state. A completion time limit of three and a half years, with penalty clauses for failure of adherence to this limit, was written into the contract. The final cost overrun was £150,000.
In 1927, the ESB was established and took control of the scheme and electricity supply and generation generally. At the time, it was the largest hydroelectric station in the world, though this was soon superseded by the Hoover Dam, which commenced construction in 1930.
Developed in conjunction with German engineering giant Siemens, most of the skilled workers and engineers on the power station were Germans. A camp was set up for the workers that included living quarters for 750 men and a dining room that seated 600. Initially employment for 700 was provided, whilst at its peak there were 5,200 employed during the construction phase, with this dropping back to 2,500 near completion. The construction project was not without controversy, with national and governmental debate over wages, conditions, strikes, and spending over-runs.
The influential London Financial Times was highly impressed with the result, commenting:
- They have thrown on their shoulders the not easy task of breaking what is in reality an enormous inferiority complex and the Shannon Scheme is one - and probably the most vital - of their methods of doing it.
Read more about this topic: Ardnacrusha Power Plant
Famous quotes containing the word scheme:
“I have no scheme about it,no designs on men at all; and, if I had, my mode would be to tempt them with the fruit, and not with the manure. To what end do I lead a simple life at all, pray? That I may teach others to simplify their lives?and so all our lives be simplified merely, like an algebraic formula? Or not, rather, that I may make use of the ground I have cleared, to live more worthily and profitably?”