Contract
The initial procurement process was built around a “design to price” concept in which the final delivery cost per system was fixed in the contract. The SLQ-32 was designed to support the protection of ships against anti-ship missiles in an open sea environment. After initial deployment of the system, naval roles began to change requiring ships to operate much closer to shore in denser signal environments. This change in roles required changes to the SLQ-32 systems which were added over time. With experience gained working with the SLQ-32, coupled with improvements to the hardware and software, technicians and operators gradually overcame the initial problems. The SLQ-32 is now the mainstay of surface electronic warfare in the U.S. Navy and U.S. Coast Guard's WMEC 270-foot (82 m) Class Ships.
Read more about this topic: AN/SLQ-32 Electronic Warfare Suite
Famous quotes containing the word contract:
“Any intelligent woman who reads the marriage contract and then goes into it, deserves all the consequences.”
—Isadora Duncan (18781927)
“A contract for better for worse is a contract that should not be tolerated.”
—George Bernard Shaw (18561950)
“The way in which men cling to old institutions after the life has departed out of them, and out of themselves, reminds me of those monkeys which cling by their tailsaye, whose tails contract about the limbs, even the dead limbs, of the forest, and they hang suspended beyond the hunters reach long after they are dead. It is of no use to argue with such men. They have not an apprehensive intellect, but merely, as it were a prehensile tail.”
—Henry David Thoreau (18171862)