Altoona Works - Major Facilities (1920s)

Major Facilities (1920s)

  • Altoona Machine Shops (renamed 12th St Car Shop in 1938)
    • Built steam locomotives during 1866-1904
    • Later in 20th century it handled locomotive repair and manufacture of engine parts
  • Altoona Car Shops
    • Built 1869
    • Manufactured freight cars and passenger cars
  • Juniata Shops
    • Built 1888-1890; expanded 1924-25
    • Built steam and electric locomotives during 1891-1946
    • Included a paint shop, boiler shop, blacksmith shop, boiler house, erecting shop, two-story machine shop, electric and hydraulic house, two-story office and storeroom, paint storehouse and gas house, and hydraulic transfer table and pit.
    • Repair work only in mid-20th century
    • Builds and remanufactures locomotives today
  • South Altoona Foundries
    • Manufactured cast iron and brass castings
Map of Altoona Works

Read more about this topic:  Altoona Works

Famous quotes containing the words major and/or facilities:

    Our major universities are now stuck with an army of pedestrian, toadying careerists, Fifties types who wave around Sixties banners to conceal their record of ruthless, beaverlike tunneling to the top.
    Camille Paglia (b. 1947)

    Marriage is good enough for the lower classes: they have facilities for desertion that are denied to us.
    George Bernard Shaw (1856–1950)