Airport Core Programme
The Hong Kong Airport Core Programme (Chinese: 香港機場核心計劃) was a series of infrastructure projects centred around the new Hong Kong International Airport during the early 1990s. The programme was part of the Port and Airport Development Strategy, commonly known as the Rose Garden Project.
The cost for the whole project was estimated at over HK$200 billion, and the Chinese Government was concerned about its impact on the financial reserve of the future Hong Kong SAR Government. Several changes were made to the plan, including the shortening of the Tsing Ma Bridge and the constructing of the Airport Railway as a double-track railway. The project ended up costing HK$160.2 billion (160,200,000,000).
The Programme formally commenced after the signing of a memorandum of understanding between British Prime Minister John Major and Chinese Premier Li Peng in Beijing on 3 September 1991, and lasted 8 years in total. It was the biggest infrastructure programme in Hong Kong's history.
Read more about Airport Core Programme: History, Exhibition Centre
Famous quotes containing the words airport, core and/or programme:
“It was like taking a beloved person to the airport and returning to an empty house. I miss the people. I miss the world.”
—Susan Sontag (b. 1933)
“It is possible to have a strong self-love without any self-satisfaction, rather with a self-discontent which is the more intense because ones own little core of egoistic sensibility is a supreme care.”
—George Eliot [Mary Ann (or Marian)
“The idealists programme of political or economic reform may be impracticable, absurd, demonstrably ridiculous; but it can never be successfully opposed merely by pointing out that this is the case. A negative opposition cannot be wholly effectual: there must be a competing idealism; something must be offered that is not only less objectionable but more desirable.”
—Charles Horton Cooley (18641929)