Operational Cost
The ACR has a planned lifetime capacity factor of greater than 93%. This is achieved by a three year planned outage frequency, with a 21-day planned outage duration and 1.5% per year forced outage. Quadrant separation allows flexibility for on-line maintenance and outage management. A high degree of safety system testing automation also reduces cost.
Read more about this topic: Advanced CANDU Reactor
Famous quotes containing the word cost:
“I acknowledge that the balance I have achieved between work and family roles comes at a cost, and every day I must weigh whether I live with that cost happily or guiltily, or whether some other lifestyle entails trade-offs I might accept more readily. It is always my choice: to change what I cannot tolerate, or tolerate what I cannotor will notchange.”
—Melinda M. Marshall (20th century)