Adaptive Management - Application To Environmental Projects and Programs

Application To Environmental Projects and Programs

Open Standards for the Practice of Conservation lay out 5 main steps to an adaptive management project cycle (see Figure 1). The Open Standards represent a compilation and adaptation of best practices and guidelines across several fields and across several organizations within the conservation community. Since the release of the initial Open Standards (updated in 2007), thousands of project teams from conservation organizations (e.g., TNC, Rare, and WWF), local conservation groups, and donors alike have begun applying these Open Standards to their work. In addition, several CMP members have developed training materials and courses to help apply the Standards.

Some recent write-ups of adaptive management in conservation include: wildlife protection (SWAP, 2008), forests ecosystem protection (CMER, 2010), coastal protection and restoration (LACPR, 2009), natural resource management (water, land and soil), species conservation especially, fish conservation from overfishing (FOS, 2007) and climate change (DFG, 2010). In addition, some other examples follow:

  • In 2006-2007, FOS worked with The National Fish and Wildlife Foundation (NFWF) to develop an evaluation system help NFWF gauge impact across the various coral reef habitat and species conservation projects;
  • In 2007, FOS worked with the Ocean Conservancy (OC) to evaluate the effectiveness of this Scorecard in helping to end overfishing in domestic fisheries.
  • Between1999-2004, FOS worked for WWF’s Asian Rhino and Elephant Action Strategy (AREAS) Program to ensure that Asian elephants and rhinos thrive in secure habitats within their historical range and in harmony with people.
  • The Department of Fish and Game (DFG) is developing and implementing adaptation strategies to help protect, restore and manage fish and wildlife, with the understanding that some level of climate change will occur and that it will have profound effects on Massachusetts habitats.
  • The Adaptive Management program was created by CMR to provide science-based recommendations and technical information to assist the Forest Practices Board. In April 2010, the Forest Practices Adaptive Management Annual Science Conference was held in Washington.
  • In 2009, The Louisiana Coastal Protection and Restoration (LACPR) Technical Report has been developed by the United States Army Corps of Engineers (USACE) according to adaptive management process.

Read more about this topic:  Adaptive Management

Famous quotes containing the words application to, application, projects and/or programs:

    The receipt to make a speaker, and an applauded one too, is short and easy.—Take of common sense quantum sufficit, add a little application to the rules and orders of the House, throw obvious thoughts in a new light, and make up the whole with a large quantity of purity, correctness, and elegancy of style.
    Philip Dormer Stanhope, 4th Earl Chesterfield (1694–1773)

    I conceive that the leading characteristic of the nineteenth century has been the rapid growth of the scientific spirit, the consequent application of scientific methods of investigation to all the problems with which the human mind is occupied, and the correlative rejection of traditional beliefs which have proved their incompetence to bear such investigation.
    Thomas Henry Huxley (1825–95)

    One of the things that is most striking about the young generation is that they never talk about their own futures, there are no futures for this generation, not any of them and so naturally they never think of them. It is very striking, they do not live in the present they just live, as well as they can, and they do not plan. It is extraordinary that whole populations have no projects for a future, none at all.
    Gertrude Stein (1874–1946)

    There is a delicate balance of putting yourself last and not being a doormat and thinking of yourself first and not coming off as selfish, arrogant, or bossy. We spend the majority of our lives attempting to perfect this balance. When we are successful, we have many close, healthy relationships. When we are unsuccessful, we suffer the natural consequences of damaged and sometimes broken relationships. Children are just beginning their journey on this important life lesson.
    —Cindy L. Teachey. “Building Lifelong Relationships—School Age Programs at Work,” Child Care Exchange (January 1994)