Absolute Risk Reduction - Worked Example

Worked Example

Example 1: risk reduction Example 2: risk increase
Experimental group (E) Control group (C) Total (E) (C) Total
Events (E) EE = 15 CE = 100 115 EE = 75 CE = 100 175
Non-events (N) EN = 135 CN = 150 285 EN = 75 CN = 150 225
Total subjects (S) ES = EE + EN = 150 CS = CE + CN = 250 400 ES = 150 CS = 250 400
Event rate (ER) EER = EE / ES = 0.1, or 10% CER = CE / CS = 0.4, or 40% EER = 0.5 (50%) CER = 0.4 (40%)
Equation Variable Abbr. Example 1 Example 2
CER − EER < 0: absolute risk reduction ARR (−)0.3, or (−)30% N/A
> 0: absolute risk increase ARI N/A 0.1, or 10%
(CER − EER) / CER < 0: relative risk reduction RRR (−)0.75, or (−)75% N/A
> 0: relative risk increase RRI N/A 0.25, or 25%
1 / (CER − EER) < 0: number needed to treat NNT (−)3.33 N/A
> 0: number needed to harm NNH N/A 10
EER / CER relative risk RR 0.25 1.25
(EE / EN) / (CE / CN) odds ratio OR 0.167 1.5
EER − CER attributable risk AR (−)0.30, or (−)30% 0.1, or 10%
(RR − 1) / RR attributable risk percent ARP N/A 20%
1 − RR (or 1 − OR) preventive fraction PF 0.75, or 75% N/A

Read more about this topic:  Absolute Risk Reduction

Famous quotes containing the word worked:

    It doesn’t seem so much to climb a mountain
    You’ve worked around the foot of all your life.
    Robert Frost (1874–1963)

    These last worked only one hour, and you have made them equal to us who have borne the burden of the day and the scorching heat.
    Bible: New Testament, Matthew 20:12.