A9 (Croatia) - Further Construction

Further Construction

The 2B stage of the upgrade to be carried out along the A9 includes construction of parallel structures at the Mirna Bridge and the Limska Draga Viaduct intended for each to carry an additional carriageway of the motorway. The stage is scheduled to be completed by 2014.

The final section of the motorway, the northernmost section between the Umag interchange and the Slovenian border at Kaštel and Dragonja border crossing, is currently spanned by a two-lane connector road via a roundabout located at the provisional northern terminus of the A9. Since the Kaštel and Dragonja border crossing is the agreed contact point for the motorway link between Croatia and Slovenia, the section is expected to be built when Slovenia completes its H5 expressway; connecting the border crossing to Koper and its motorway system. The Slovenian motorway development company DARS currently plans to build the expressway after 2013.

Read more about this topic:  A9 (Croatia)

Famous quotes containing the word construction:

    Striving toward a goal puts a more pleasing construction on our advance toward death.
    Mason Cooley (b. 1927)

    There’s no art
    To find the mind’s construction in the face.
    William Shakespeare (1564–1616)