A-90 Orlyonok - Production

Production

Overall only five units were built:

  • Non-flying unit for static testing, scrapped
  • S-23 flying unit, crashed in 1975
  • S-21 rebuilt "S-23", completed in 1978, lost during an accident in 1992
  • S-25 completed in 1979
  • S-26 completed in 1980

The A-90 entered military service in 1979. Units S-21, S-25 and S-26 remained in active service at least until 1993.

Read more about this topic:  A-90 Orlyonok

Famous quotes containing the word production:

    Just as modern mass production requires the standardization of commodities, so the social process requires standardization of man, and this standardization is called equality.
    Erich Fromm (1900–1980)

    The heart of man ever finds a constant succession of passions, so that the destroying and pulling down of one proves generally to be nothing else but the production and the setting up of another.
    François, Duc De La Rochefoucauld (1613–1680)

    Constant revolutionizing of production ... distinguish the bourgeois epoch from all earlier ones. All fixed, fast-frozen relations, with their train of ancient and venerable prejudices are swept away, all new-formed ones become antiquated before they can ossify. All that is solid melts into air, all that is holy is profaned, and man is at last compelled to face with sober senses, his real conditions of life, and his relations with his kind.
    Karl Marx (1818–1883)