EVAs
Start Date/Time | Duration | End Time | Spacecraft | Crew | Remarks | |
---|---|---|---|---|---|---|
21 January 10:05 |
5 hours 23 minutes |
15:49 | Expedition 26 ISS Pirs |
Dmitri Kondratyev Oleg Skripochka |
Prepared the ISS Poisk module for future dockings. | |
16 February 13:15 |
6 hours 23 minutes |
18:15 | Expedition 26 ISS Pirs |
Dmitri Kondratyev Oleg Skripochka |
Installed a radio antenna, deployed a nanosatellite, installed two experiments and retrieved two exposure panels on a third experiment. | |
28 February 15:46 |
6 hours 34 minutes |
22:20 | STS-133 ISS Quest |
Stephen Bowen Alvin Drew |
Removed a failed coolant pump and routed a power extension cable. | |
2 March 15:41 |
6 hours 14 minutes |
21:55 | STS-133 ISS Quest |
Stephen Bowen Alvin Drew |
Removed or repaired thermal insulation, swapped out an attachment bracket on the Columbus module, installed a camera assembly on Dextre and installed a light on a cargo cart. | |
20 May 07:10 |
6 hours 19 minutes |
13:29 | STS-134 ISS Quest |
Andrew Feustel Gregory Chamitoff |
Completed installation of a new set of MISSE experiments, started installing a new wireless video system, installed an ammonia jumper, a new light on the CETA cart on the S3 truss segment, and a cover on the starboard SARJ. | |
22 May 06:05 |
8 hours 07 minutes |
14:12 | STS-134 ISS Quest |
Andrew Feustel Michael Fincke |
Hooked up a jumper to transfer ammonia to the Port 6 PVTCS, lubricated the SARJ and one of the "hands" on Dextre, and installed a stowage beam on the S1 truss. | |
25 May 05:43 |
6 hours 54 minutes |
12:37 | STS-134 ISS Quest |
Andrew Feustel Michael Fincke |
Installed PDGF (except for data cable), routed power cables from Unity to Zarya, finished installation of wireless video system, took pictures of Zarya's thrusters and captured infrared video of an experiment in ELC 3. | |
27 May 04:15 |
7 hours 24 minutes |
11:39 | STS-134 ISS Quest |
Gregory Chamitoff Mike Fincke |
Installed OBSS on S1 truss, removed the EFGF and replaced it with a spare PDGF, and released some torque on the bolts that were holding the spare arm for Dextre down against ELC 3. Final shuttle spacewalk. | |
12 July 13:22 |
6 hours 31 minutes |
19:53 | Expedition 28 ISS Quest |
Ronald Garan Michael Fossum |
Moved a failed cooling pump from the station to the shuttle Atlantis, transferred a robotic refuelling apparatus from the shuttle to the ISS, installed a materials science experiment on the station's truss, serviced a robot arm attachment fitting, installed a thermal cover over the unused docking port PMA-3, and fixed a protruding wire on a grapple fixture on the Zarya module. | |
3 August 14:51 |
6 hours 22 minutes |
21:22 | Expedition 28 ISS Pirs |
Sergei Volkov Aleksandr Samokutyayev |
Launched Kedr satellite, installed BIORISK experiment outside Pirs, and installed laser communication equipment to transmit scientific data from the Russian Orbital Segment. |
Read more about this topic: 2011 In Spaceflight