Verification of machinery and equipment usually consists of design qualification (DQ), installation qualification (IQ), operational qualification (OQ), and performance qualification (PQ). DQ is usually a vendor's job. However, DQ can also be performed by the user, by confirming through review and testing that the equipment meets the written acquisition specification. If the relevant document or manuals of machinery/equipment are provided by vendors, the later 3Q needs to be thoroughly performed by the users who work in an industrial regulatory environment. Otherwise, the process of IQ, OQ and PQ is the task of validation. The typical example of such a case could be the loss or absence of vendor's documentation for legacy equipment or do-it-yourself (DIY) assemblies (i.e., cars, computers etc.) and, therefore, users should endeavour to acquire DQ document beforehand. Each template of DQ, IQ, OQ and PQ usually can be found on the internet respectively, whereas the DIY qualifications of machinery/equipment can be assisted either by the vendor's training course materials and tutorials, or by the published guidance books, such as step-by-step series if the acquisition of machinery/equipment is not bundled with on- site qualification services. This kind of the DIY approach is also applicable to the qualifications of software, computer operating systems and a manufacturing process. The most important and critical task as the last step of the activity is to generating and archiving machinery/equipment qualification reports for auditing purposes, if regulatory compliances are mandatory.

Qualification of machinery/equipment is venue dependent, in particular items that are shock sensitive and require balancing or calibration, and re-qualification needs to be conducted once the objects are relocated. The full scales of some equipment qualifications are even time dependent as consumables are used up (i.e. filters) or springs stretch out, requiring recalibration, and hence re-certification is necessary when a specified due time lapse. Re-qualification of machinery/equipment should also be conducted when replacement of parts, or coupling with another device, or installing a new application software and restructuring of the computer which affects especially the pre-settings, such as on BIOS, registry, disk drive partition table, or an ini file etc., have been necessary. In such a situation, the specifications of the parts/devices/software and restructuring proposals should be appended to the qualification document whether the parts/devices/software are genuine or not. Torres and Hyman have discussed the suitability of non genuine parts for clinical use and provided guidelines for equipment users to select appropriate substitutes which are capable to avoid adverse effects. In the case when genuine parts/devices/software are demanded by some of regulatory requirements, then re-qualification does not need to be conducted on the non genuine assemblies. Instead, the asset has to be recycled for non regulatory purposes.

When machinery/equipment qualification is conducted by a standard endorsed third party such as by an ISO standard accredited company for a particular division, the process is called certification. Currently, the coverage of ISO/IEC 15408 certification by an ISO/IEC 27001 accredited organization is limited, the scheme requires a fair amount of efforts to get popularized.

Read more about this topic:  Verified

Famous quotes containing the word activities:

    There is, I think, no point in the philosophy of progressive education which is sounder than its emphasis upon the importance of the participation of the learner in the formation of the purposes which direct his activities in the learning process, just as there is no defect in traditional education greater than its failure to secure the active cooperation of the pupil in construction of the purposes involved in his studying.
    John Dewey (1859–1952)

    ...I have never known a “movement” in the theater that did not work direct and serious harm. Indeed, I have sometimes felt that the very people associated with various “uplifting” activities in the theater are people who are astoundingly lacking in idealism.
    Minnie Maddern Fiske (1865–1932)

    When mundane, lowly activities are at stake, too much insight is detrimental—far-sightedness errs in immediate concerns.
    Franz Grillparzer (1791–1872)