United States Penitentiary, Hazelton - Facility

Facility

USP Hazelton was built due to an increasing need for modern facilities to house the growing number of federal inmates. The high security facility and the satellite minimum security prison camp cost $129 million to build and takes up 996 acres, and were designed by KZF Architectural Firm.

The 650,000-square-foot high-security facility, completed in 2004, contains six two-story buildings with 768 general housing cells and 120 "special housing cells" where especially dangerous prisoners are housed. In addition, there are several one- and two-story buildings which house various prison programs, as well as a factory where prisoners work. It is surrounded by a triple security fence with a taut wire system, and six guard towers around the perimeter.

The 27,000-square-foot minimum security Federal Prison Camp, also completed in 2004, is located outside the high security perimeter of the high-security facility. It consists of living units and prison program facilities and has a capacity of 128 inmates.

The 250,000-square-foot Secure Female Facility was completed in 2006 at a cost of $69 million. It contains two housing buildings which have a capacity of 512 inmates, as well as several program buildings which surround a courtyard area.

Read more about this topic:  United States Penitentiary, Hazelton

Famous quotes containing the word facility:

    Probability but no truth, facility but no freedom—it is owing to these two fruits that the tree of knowledge cannot be confused with the tree of life.
    Friedrich Nietzsche (1844–1900)

    Virtue rejects facility to be her companion.... She requires a craggy, rough and thorny way.
    Michel de Montaigne (1533–1592)

    In progress of time, when my mind was, as it were, strongly impregnated with the Johnsonian æther, I could, with much more facility and exactness, carry in my memory and commit to paper the exuberant variety of his wit and wisdom.
    James Boswell (1740–1795)