TransCanada Corporation - Proposed Oakville Generating Station

Proposed Oakville Generating Station

In June 2010, TransCanada was embroiled in a controversy surrounding a plan to construct a 975 MW gas-fired power plant on a disused 13.5-acre (5.5 ha) portion of Ford's Oakville, Ontario assembly plant. Local residents and politicians have expressed health and safety concerns to Ford in opposition to the plan.

Citing the 2010 gas-fired power-plant explosion plant in Middletown, Connecticut, U.S., and the 2008 Toronto propane explosion, Oakville MPP Kevin Flynn introduced a private member's bill that would require a 1500-meter buffer zone for such a plant, a proposal intended to effectively prevent the construction of this project.

The proposed Oakville site was ultimately abandoned in response to political pressure; the station will instead be built on the Lennox Generating Station site west of Bath, Ontario.

Read more about this topic:  TransCanada Corporation

Famous quotes containing the words proposed and/or station:

    ...a fixed aim furnishes us with a fixed measure, by which we can decide whether such or such an action proposed is worth trying for or not, and as aims must vary with the individual, the decisions of any two people as to the desirableness of an action may not be the same.
    Anna C. Brackett (1836–1911)

    It was evident that the same foolish respect was not here claimed for mere wealth and station that is in many parts of New England; yet some of them were the “first people,” as they are called, of the various towns through which we passed.
    Henry David Thoreau (1817–1862)