Building/structure Details
The station building was constructed using reinforced concrete, which was then covered with roughly hewn shell limestone ashlar, sourced from the area around Crailsheim. The station tower is 56 meters high, with a rotating Mercedes-Benz star, measuring 5 meters in radius, on the visitor's terrace on the 9th level, right above the Bistro21. Also on the tower is a clock, whose radius measures 5.5 meters. Inside the tower is the TurmForum Stuttgart 21, which provides information and media to do with the Stuttgart 21 project.
The front of the building features a quote by Georg Wilhelm Friedrich Hegel in the form of a lit inscription - the quote reads … daß diese Furcht zu irren schon der Irrtum selbst ist. - loosely translated as "… that this fear of making a mistake is a mistake itself." The inscription is a work by the artist Joseph Kosuth from the early 1990s.
Long-distance trains end their run in the above-ground terminus station at one of 17 tracks (1-16 and 1a), which is located on the second floor of the main hall, with the main entrance and service counters on the ground floor. Also in the main hall, near the south exit, a DB Lounge for first-class passengers and members of frequent-traveller programs, such as bahn.comfort, AIRail, or Miles & More, may be found. In the underground S-Bahn station, which is on the 3rd underground floor, all S-Bahn traffic, which is managed by the Verkehrs- und Tarifverbund Stuttgart (VVS), stops at one of two tracks (numbered 101 and 102).
Under the station forecourt, the seven lines of the Stadtbahn traverse the 2nd underground floor. A personnel passage on the 1st underground floor, which features many stores and boutiques, serves as the pedestrian connection between the Hauptbahnhof and the city center. A part of this 1st underground floor is taken up by an underground parking garage, and a multi-use shelter. In case of a civil emergency, a section of the garage would turn into a shelter with beds, separated from the rest of the garage by pressurized doors; the control room, kitchen, sanitation equipment, and water-and air conditioning for the shelter are located in the 2nd underground floor.
Read more about this topic: Stuttgart Central Station
Famous quotes containing the words building, structure and/or details:
“And when discipline is concerned, the parent who has to make it to the end of an eighteen-hour daywho works at a job and then takes on a second shift with the kids every nightis much more likely to adopt the survivors motto: If it works, Ill use it. From this perspective, dads who are even slightly less involved and emphasize firm limits or character- building might as well be talking a foreign language. They just dont get it.”
—Ron Taffel (20th century)
“... the structure of our public morality crashed to earth. Above its grave a tombstone read, Be toleranteven of evil. Logically the next step would be to say to our commonwealths criminals, I disagree that its all right to rob and murder, but naturally I respect your opinion. Tolerance is only complacence when it makes no distinction between right and wrong.”
—Sarah Patton Boyle, U.S. civil rights activist and author. The Desegregated Heart, part 2, ch. 2 (1962)
“Different persons growing up in the same language are like different bushes trimmed and trained to take the shape of identical elephants. The anatomical details of twigs and branches will fulfill the elephantine form differently from bush to bush, but the overall outward results are alike.”
—Willard Van Orman Quine (b. 1908)