Space Shuttle Atlantis - Flight Listing

Flight Listing

# Launch date Designation Launch Pad Landing Location Duration Distance Notes
1 3 October 1985 STS-51-J 39A Edwards AFB 4 days, 1 hour, 44 minutes, 38 seconds 1,682,641 miles (2,707,948 km) First Atlantis mission; mission dedicated to Department of Defense. Deployed two DSCS-III (Defense Satellite Communications System) satellites into stationary orbit.
2 26 November 1985 STS-61-B 39A Edwards AFB 6 days, 21 hours, 4 minutes, 49 seconds 2,466,956 miles (3,970,181 km) 3 communications satellites deployed: MORELOS-B, AUSSAT-2 and SATCOM KU-2
3 2 December 1988 STS-27 39B Edwards AFB 4 days, 9 hours, 5 minutes, 37 seconds 1,812,075 miles (2,916,252 km) Mission dedicated to Department of Defense. Deployed the Lacrosse 1 satellite, for the US National Reconnaissance Office (NRO) and the Central Intelligence Agency (CIA). Atlantis' Thermal Protection System tiles sustained unusually severe damage during the flight; over 700 damaged tiles were noted, and one tile was missing.
4 4 May 1989 STS-30 39B Edwards AFB 4 days, 0 hours, 56 minutes, 28 seconds 1,477,500 miles (2,377,800 km) Deployed the Magellan probe bound for Venus.
5 18 October 1989 STS-34 39B Edwards AFB 4 days, 23 hours, 39 minutes, 20 seconds 1,800,000 miles (2,900,000 km) Deployed the Galileo probe bound for Jupiter.
6 28 February 1990 STS-36 39A Edwards AFB 4 days, 10 hours, 18 minutes, 22 seconds 1,837,962 miles (2,957,913 km) Mission dedicated to Department of Defense. STS-36 deployed a single satellite believed to have been a Misty reconnaissance satellite.
7 15 November 1990 STS-38 39A KSC 4 days, 21 hours, 54 minutes, 31 seconds 2,045,056 miles (3,291,199 km) Mission dedicated to Department of Defense. Deployed USA-67 believed to have been a secret Magnum ELINT (ELectronic INTtelligence) gathering satellite.
8 5 April 1991 STS-37 39B Edwards AFB 5 days, 23 hours, 32 minutes, 44 seconds 2,487,075 miles (4,002,559 km) Deployed Compton Gamma Ray Observatory (GRO), the second of the Great Observatories program.
9 2 August 1991 STS-43 39A KSC 8 days, 21 hours, 21 minutes, 25 seconds 3,700,400 miles (5,955,200 km) Deployed Tracking and Data Relay Satellite-5 (TDRS-5 or TDRS-E).
10 24 November 1991 STS-44 39A Edwards AFB 6 days, 22 hours, 50 minutes, 44 seconds 2,890,067 miles (4,651,112 km) Mission dedicated to Department of Defense. The unclassified payload included a Defense Support Program (DSP) satellite deployed on flight day one.
11 24 March 1992 STS-45 39A KSC 8 days, 22 hours, 9 minutes 28 seconds 3,274,946 miles (5,270,515 km) Carried first Atmospheric Laboratory for Applications and Science (ATLAS-1). ATLAS-1 equipped with 12 instruments conducted studies in atmospheric chemistry, solar radiation, space plasma physics and ultraviolet astronomy.
12 31 July 1992 STS-46 39A KSC 7 days, 23 hours, 15 minutes, 3 seconds 3,321,007 miles (5,344,643 km) Deployed the Tethered Satellite System (TSS), a joint NASA/Italian Space Agency experiment. The satellite only reached a maximum of 860 feet (260 m) instead of 12.5 miles (20.1 km), because of a jammed tether line. The European Retrievable Carrier (EURECA) satellite was deployed for the European Space Agency (ESA).
13 3 November 1994 STS-66 39B Edwards AFB 10 days, 22 hours, 34 minutes, 2 seconds 4,554,791 miles (7,330,226 km) Carried Atmospheric Laboratory for Applications and Sciences – 3 (ATLAS-03) to study the energy of the sun and how it affects the Earth's climate and environment. In addition, STS-66 included deployment and retrieval of the Cryogenic Infrared Spectrometer Telescope for Atmosphere (CRISTA) to explore the variability of the atmosphere and provide measurements.
14 29 June 1995 STS-71 39A KSC 9 days, 19 hours, 22 minutes, 17 seconds 4,100,000 miles (6,600,000 km) First shuttle docking with space station Mir. 100th U.S manned space flight. Atlantis transported two cosmonauts Anatoly Solovyev and Nikolai Budarin to Mir and returned astronaut Norman Thagard and cosmonauts Vladimir Dezhurov and Gennady Strekalov. The joint U.S-Russian crew performed life sciences investigations aboard SPACELAB/Mir.
15 12 November 1995 STS-74 39A KSC 8 days, 4 hours, 31 minutes, 42 seconds 3,400,000 miles (5,500,000 km) Carried docking module to Mir and docked to the Kristall module. During the three days of combined shuttle-Mir operations, Atlantis's crew transferred water, supplies, equipment and two new solar arrays to upgrade Mir.
16 22 March 1996 STS-76 39B Edwards AFB 9 days, 5 hours, 16 minutes, 48 seconds 3,800,000 miles (6,100,000 km) Rendezvous with Mir, including crew transfer of Shannon Lucid. STS-76 marked first flight of SPACEHAB pressurized module to support Shuttle-Mir dockings. Spacewalkers Linda Godwin and Michael Clifford conducted the first U.S. extravehicular activity (EVA) around the two mated spacecrafts.
17 16 September 1996 STS-79 39A KSC 10 days, 3 hours, 19 minutes, 28 seconds 3,900,000 miles (6,300,000 km) Rendezvous with Mir, including crew transfer of Shannon Lucid and John Blaha. First shuttle mission to the fully completed Mir in its final configuration. STS-79 also marked second flight of SPACEHAB module in support of Shuttle-Mir activities and first flight of SPACEHAB Double Module configuration.
18 12 January 1997 STS-81 39B KSC 10 days, 4 hours, 56 minutes, 30 seconds 3,900,000 miles (6,300,000 km) Rendezvous with Mir, including crew transfer of John Blaha and Jerry Linenger. Carried the SPACEHAB double module and during five days of docked operations with Mir, the crews transferred water and supplies.
19 15 May 1997 STS-84 39A KSC 9 days, 5 hours, 20 minutes, 47 seconds 3,600,000 miles (5,800,000 km) Rendezvous with Mir, including crew transfer of Jerry Linenger and Michael Foale. Carried the SPACEHAB double module.
20 25 September 1997 STS-86 39A KSC 10 days, 19 hours, 22 minutes, 12 seconds 4,225,000 miles (6,799,000 km) Rendezvous with Mir, including crew transfer of Michael Foale and David A. Wolf. Highlights of STS-86 included five days of docked operations and the first joint U.S.-Russian spacewalk during a shuttle mission conducted by cosmonaut Vladimir Titov and astronaut Scott Parazynski.
21 19 May 2000 STS-101 39A KSC 9 days, 21 hours, 10 minutes, 10 seconds 5,076,281 miles (8,169,482 km) International Space Station resupply mission with supplies carried up using a SPACEHAB double module and SPACEHAB Integrated Cargo Carrier pallet. Astronauts James Voss and Jeffrey Williams performed a spacewalk and Atlantis also reboosted the ISS.
22 8 September 2000 STS-106 39B KSC 11 days, 19 hours, 12 minutes, 15 seconds 4,919,243 miles (7,916,754 km) International Space Station resupply mission. STS-106 utilized the SPACEHAB Double Module and the Integrated Cargo Carrier (ICC) to bring supplies to the ISS. The mission also included two spacewalks.
23 7 February 2001 STS-98 39A Edwards AFB 12 days, 21 hours, 21 minutes 5,369,576 miles (8,641,495 km) International Space Station assembly mission (carried and assembled the Destiny Laboratory Module). Three spacewalks including the 100th in the U.S. manned spaceflight program were conducted to complete its assembly.
24 12 July 2001 STS-104 39B KSC 12 days, 18 hours, 36 minutes, 39 seconds 5,309,429 miles (8,544,698 km) International Space Station assembly mission (carried and assembled the Quest Joint Airlock). Astronauts Michael Gernhardt and James Reilly conducted three space walks while Atlantis was docked to the ISS. STS-104 was the first shuttle mission to fly with a "Block II" SSME.
25 8 April 2002 STS-110 39B KSC 10 days, 19 hours, 43 minutes, 48 seconds 4,525,299 miles (7,282,763 km) International Space Station assembly mission (carried and assembled the S0 truss segment) which forms the backbone of the truss structure on the ISS. STS-110 also delivered the Mobile Transporter (MT). Four spacewalks were also conducted in support of ISS construction.
26 7 October 2002 STS-112 39B KSC 10 days, 19 hours, 58 minutes, 44 seconds 4,513,015 miles (7,262,994 km) International Space Station assembly mission (carried and assembled the S1 truss segment). Atlantis also delivered the Crew Equipment Translation Aid (CETA). Astronauts David Wolf and Piers Sellers conducted three spacewalks. A camera mounted to the shuttle's external tank captured the ascent to orbit. This was the first time such footage was recorded.
27 9 September 2006 STS-115 39B KSC 11 days, 19 hours, 6 minutes, 35 seconds 4,910,288 miles (7,902,343 km) International Space Station resupply and construction (P3 and P4 truss segments, solar arrays 2A and 4A and batteries). STS-115 was the first assembly mission to the ISS after the Columbia disaster. A total of three spacewalks were performed, during which the crew connected the systems on the installed trusses, prepared them for deployment and did other maintenance work on the ISS.
28 8 June 2007 STS-117 39A Edwards AFB 13 days, 20 hours, 12 minutes, 44 seconds 5,809,363 miles (9,349,263 km) International Space Station resupply and construction (S3 and S4 truss and a set of solar arrays segments) The launch of STS-117 marked the 250th orbital human spaceflight. STS-117 brought Expedition 15 crewmember Clayton Anderson to the ISS, and returned with Sunita Williams.
29 7 February 2008 STS-122 39A KSC 12 days, 18 hours, 21 minutes, 50 seconds 5,296,842 miles (8,524,441 km) International Space Station construction (Columbus laboratory). STS-122 carried ESA astronaut Léopold Eyharts, a French Flight Engineer representing ESA to the ISS and returned Expedition 16 Flight Engineer Daniel M. Tani to Earth. Three spacewalks were performed by mission specialists Rex Walheim and Stanley Love.
30 11 May 2009 STS-125 39A Edwards AFB 12 days, 21 hours, 37 minutes, 9 seconds 5,276,000 miles (8,491,000 km) Final Hubble Space Telescope Servicing Mission 4. Atlantis carried two new instruments to the Hubble Space Telescope, the Cosmic Origins Spectrograph and the Wide Field Camera 3. The mission also replaced a Fine Guidance Sensor, six gyroscopes, and two battery unit modules. The mission included five spacewalks totaling 37 hours. STS-125 carried an IMAX camera to document the progress of the mission.
31 16 November 2009 STS-129 39A KSC 10 days, 19 hours, 16 minutes, 13 seconds 4,490,138 miles (7,226,177 km) International Space Station resupply and construction (ELC-1/ELC-2). STS-129 was the first flight of an ExPRESS Logistics Carrier and focused on staging spare components outside the space station. The mission included three spacewalks.
32 14 May 2010 STS-132 39A KSC 11 days, 18 hours, 29 minutes, 09 seconds 4,879,978 miles (7,853,563 km) International Space Station construction (Mini-Research Module 1 and the cargo pallet, Integrated Cargo Carrier-Vertical Light Deployable (ICC-VLD)). The mission included three spacewalks.
33 8 July 2011 STS-135 39A KSC 12 days, 18 hours, 28 minutes, 50 seconds 5,284,862 miles (8,505,161 km) International Space Station resupply using the Raffaello Multi-Purpose Logistics Module and the Lightweight Multi-Purpose Carrier (LMC). The failed ammonia pump module that was replaced in August 2010 returned inside Atlantis' payload bay. This was the final mission of Space Shuttle Atlantis and the last mission for the Space Shuttle Program. STS-135 flew with a crew of 4 astronauts; the reduced crew size allowed for rescue by regularly scheduled Soyuz missions if necessary.

Read more about this topic:  Space Shuttle Atlantis

Famous quotes containing the word flight:

    The power of a text is different when it is read from when it is copied out.... Only the copied text thus commands the soul of him who is occupied with it, whereas the mere reader never discovers the new aspects of his inner self that are opened by the text, that road cut through the interior jungle forever closing behind it: because the reader follows the movement of his mind in the free flight of day-dreaming, whereas the copier submits it to command.
    Walter Benjamin (1892–1940)