Operation
Services operate at regular intervals between April and September, taking 30 minutes for a one-way journey. There is no winter service: the overhead wires on the exposed upper part of the route are dismantled to avoid damage from icing. All passenger traffic is carried in six wooden-bodied electric railcars, built in 1895 and numbered 1 to 6. Car 5 was burned out in an accident in 1970 and its body is a replacement built in 1971 to a similar design. The cars were re-equipped in the late 1970s with new bogies to a design based on the original, using motors and traction equipment from withdrawn Aachen trams. Because of the different gauge and the centre rail, vehicles cannot inter-run between the railway and the 3 ft gauge MER. Railway vehicles are occasionally worked to the MER workshops at Douglas by swapping their bogies, and to aid this there is a dual gauge siding in Laxey. The railway is owned and operated by Isle of Man Heritage Railways, a department of the Isle of Man Government.
Read more about this topic: Snaefell Mountain Railway
Famous quotes containing the word operation:
“It requires a surgical operation to get a joke well into a Scotch understanding. The only idea of wit, or rather that inferior variety of the electric talent which prevails occasionally in the North, and which, under the name of Wut, is so infinitely distressing to people of good taste, is laughing immoderately at stated intervals.”
—Sydney Smith (17711845)
“An absolute can only be given in an intuition, while all the rest has to do with analysis. We call intuition here the sympathy by which one is transported into the interior of an object in order to coincide with what there is unique and consequently inexpressible in it. Analysis, on the contrary, is the operation which reduces the object to elements already known.”
—Henri Bergson (18591941)
“It is critical vision alone which can mitigate the unimpeded operation of the automatic.”
—Marshall McLuhan (19111980)