Calculating The Shutdown Point
The short run shutdown point is the minimum of the average variable cost curve. Assume that firms total cost function is TC = Q3 -5Q2 +60Q +125. Variable cost = Q3 -5Q2 +60Q Average variable costs = (Q3 -5Q2 +60Q)/Q= Q2 -5Q + 60
- AVC' = 2Q - 5
- AVC' = 0
- 2Q - 5 = 0
- 2Q = 5
- Q = 2.5
Read more about this topic: Shutdown (economics)
Famous quotes containing the words calculating the, calculating and/or point:
“[The] elderly and timid single gentleman in Paris ... never drove down the Champs Elysees without expecting an accident, and commonly witnessing one; or found himself in the neighborhood of an official without calculating the chances of a bomb. So long as the rates of progress held good, these bombs would double in force and number every ten years.”
—Henry Brooks Adams (18381918)
“[The] elderly and timid single gentleman in Paris ... never drove down the Champs Elysees without expecting an accident, and commonly witnessing one; or found himself in the neighborhood of an official without calculating the chances of a bomb. So long as the rates of progress held good, these bombs would double in force and number every ten years.”
—Henry Brooks Adams (18381918)
“I am less disposed to think of a West Point education as requisite for this business than I was at first. Good sense and energy are the qualities required.”
—Rutherford Birchard Hayes (18221893)