Ouvrage Denting - Design and Construction

Design and Construction

The site was surveyed by CORF (Commission d'Organisation des Régions Fortifiées), the Maginot Line's design and construction agency; Denting was approved for construction in May 1931. It was completed at a cost of 11 million francs by the contractor Duval-Weyrich of Nancy. The petit ouvrage was planned for construction in two phases. The second phase was to provide a separate entrance block a short distance to the rear. Heavy water infiltration required the provision of more extensive drainage work than originally planned.

Read more about this topic:  Ouvrage Denting

Famous quotes containing the words design and/or construction:

    If I commit suicide, it will not be to destroy myself but to put myself back together again. Suicide will be for me only one means of violently reconquering myself, of brutally invading my being, of anticipating the unpredictable approaches of God. By suicide, I reintroduce my design in nature, I shall for the first time give things the shape of my will.
    Antonin Artaud (1896–1948)

    There’s no art
    To find the mind’s construction in the face.
    William Shakespeare (1564–1616)