Detailed List of Projects For 2013
Terminology
- Year Startup: year of first oil. put specific date if available.
- Operator: company undertaking the project.
- Area: onshore (LAND), offshore (OFF), offshore deep water (ODW), tar sands (TAR).
- Type: liquid category (i.e. Natural Gas Liquids, Natural gas condensate, Crude oil)
- Grade: oil quality (light, medium, heavy, sour) or API gravity
- 2P resvs: 2P (proven + probable) oil reserves in giga barrels (Gb).
- GOR: The ratio of produced gas to produced oil, commonly abbreviated GOR.
- Peak year: year of the production plateau/peak.
- Peak: maximum production expected (thousand barrels/day).
- Discovery: year of discovery.
- Capital investment: expected capital cost; FID (Final Investment Decision) - If no FID, then normally no project development contracts can be awarded. For many projects, a FEED stage (Front End Engineering Design) precedes the FID.
- Notes: comments about the project (footnotes).
- Ref: list of sources.
| Country | Project Name | Year startup | Operator | Area | Type | Grade | 2P resvs | GOR | Peak Year | Peak | Discovery | Capital Inv. | Notes | Ref |
|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|
| OPEC | ||||||||||||||
| Angola | Block 31 SE PAJ (Palas; Astraea; Juno; Urano; Ceres; Hebe; Titania) | 2013 | BP | ODW | Crude | 110 | 2005 | |||||||
| Iran | Resalat Exp | 2013 | Amona | OFF | Crude | 35 | ||||||||
| Iraq | Nahr Omar; Bin Omar Ph 1 | 2013 | INOC | 6.0 | 200 | 1949 | No FID, maybe 450 kbd | |||||||
| Kuwait | Neutral Zone Exp | 2013 | KGOC | OFF | Crude | Heavy | 30 | |||||||
| Kuwait | Sabriyah Exp (GC 24) | 2013 | KOC | Crude | 4.3 | 2015 | 160 | 1957 | ||||||
| Nigeria | Bonga NW | 2013 | Shell | Crude | Light | 0.600 | 25 | 1998/2001 | ||||||
| Nigeria | Forcados Yokri IP | 2013 | Shell | Crude | Light | 0.600 | 55 | |||||||
| Saudi Arabia | Neutral Zone Exp | 2013 | KGOC | OFF | Crude | Heavy | 30 | |||||||
| Non-OPEC | ||||||||||||||
| Australia | Montara/Skua oilfield | 2013 | PTTEP | ODW | Crude | 35 | ||||||||
| Azerbaijan | ACG Chirag Exp | 2013 | BP | 100 | ||||||||||
| Brazil | SapinhoĆ” | 01/2013 | Petrobras | ODW | Crude | 30 | 120 | Previously called Guara South. Full production planned for mid-2014. |
|
|||||
| Brazil | Roncador Module 3 (P55) | 7/2013 | Petrobras | ODW | 22 API | 2014 | 180 | |||||||
| Brazil | Roncador Module 4 (P62) | 2013 | Petrobras | ODW | 18 API | 100 | No FID, 100 kbd | |||||||
| Brazil | Papa Terra P61 P63 | 7/2013 | Petrobras | ODW | 15 API | 0.7 | 150 | 2003 | ||||||
| Brazil | Waikiki | 2013 | OGX | OFF | Crude | 20 | 2010 | |||||||
| Canada | Birch Mountain (Phase 1) | 2013 | CNRL | LAND | Bitumen | Tar Sands | 2014 | 30 | In-Situ, Announced | |||||
| Canada | Horizon Oil Sands Project Ph 2, 3 | 2013 | CNR | LAND | Bitumen | Tar Sands | 0 | Delayed, 118 kbd | Mining & Upgrading | |||||
| Canada | Christina Lake (Unnamed Expansion 3) | 2013 | EnCana | LAND | Bitumen | Tar Sands | 30 | In-Situ, Announced | ||||||
| Canada | Sunrise Ph 1 | 1/2013 | Husky Energy | Tar sands | Bitumen | 1.0-2.2 | 0 | 50 kbd suspended | SAGD | |||||
| China | Ningxia Hui CTL | 2013 | Sasol Shenhua JV | LAND | CTL | 0 | 80 kbd | No FID | ||||||
| Kazakhstan | Karachaganak Phase III | 2013 | BG/Eni | LAND | Crude | 2014 | 0 | 1979 | 70 kbd suspended | |||||
| Kazakhstan | Kashagan Phase I | 2013 | Eni | OFF | Crude | 45 API | 13 | 300 | 2000 | |||||
| Kazakhstan | Tengiz Expansion | 2013 | Chevron | LAND | Crude | 3.3 | 260 | 1979 | ||||||
| Malaysia | Kebabangan | 2013 | Petronas | Crude | 0.15 | 2014 | 40 | |||||||
| Norway | Froy | 2013 | DNO | ODW | Crude | 0.056 | 25 | |||||||
| Norway | Goliat | 2013 | Eni | ODW | Crude | 80 | ||||||||
| Papua New Guinea | PNG LNG | 2013 | ExxonMobil Syntroleum | LAND | NGL GTL | 40 | No FID | |||||||
| Russia | Kuyumbin | 2013 | Slavneft | LAND | Crude | 60 | ||||||||
| South Africa | Secunda CTL Exp | 2013 | Sasol | LAND | Products | Diesel | 2015 | 30 | ||||||
| UK | Kessog | 2013 | BP | OFF | Crude | 25 | ||||||||
| UK | Huntington | 2013 | BP | OFF | Crude | 30 | ||||||||
| Vietnam | Hai Su Trang/Den | 2013 | Talisman | OFF | Crude | 0.06 | 25 | |||||||
Read more about this topic: Oil Megaprojects (2013)
Famous quotes containing the words detailed, list and/or projects:
“... every event has had its cause, and nothing, not the least wind that blows, is accident or causeless. To understand what happens now one must find the cause, which may be very long ago in its beginning, but is surely there, and therefore a knowledge of history as detailed as possible is essential if we are to comprehend the past and be prepared for the future.”
—Pearl S. Buck (18921973)
“My list of things I never pictured myself saying when I pictured myself as a parent has grown over the years.”
—Polly Berrien Berends (20th century)
“One of the things that is most striking about the young generation is that they never talk about their own futures, there are no futures for this generation, not any of them and so naturally they never think of them. It is very striking, they do not live in the present they just live, as well as they can, and they do not plan. It is extraordinary that whole populations have no projects for a future, none at all.”
—Gertrude Stein (18741946)